What is Hardcore?
Crushed stone which is used as a sub-base material on drives and
paths, giving a strong firm base upon which the top surface will be placed.
How long will the project take?
This depends on the size of the project and weather conditions. We
will discuss with you the timeline of your particular job in advance.
What goes in between the gaps in
Flagstones? A mixture of sand and cement wetmix, called
pointing.
When can I walk on it?
Flagstones can be used once pointed and left for 2-3 days. Block paving can be
used when finished.
What about the manhole
cover? Counter sunk manhole covers are available and paving
products can be cut to fit around, giving a good overall finish.
Do I need a skip? Yes! The
size of skip will depend upon the type of project - again we can discuss this
with you, once we know the scale of the work.
Will you need access to
electric? Occasionally we need to use smaller hand tools, so
access would be useful, but all our heavier equipment is petrol driven.
Will you need access to
water? Yes, water is quite heavy to transport, and sourcing other
points of water can slow the job down, so access to an outside tap would be
beneficial.
Does the weather affect worK?
We all know the British weather. The summer months will naturally
reduce the possibility of rainy days lost, but you may also find that we are
booked up more around those times, so book ahead or chance the weather!
Is it a free quote? Yes, and
valid for 30 days.
Will it be you doing the work?
Yes. We do not subcontract our work. Our name is our reputation and
our reputation is built upon our skilled team.
How long have you been in
business? We have been established since 1992
Do you have several jobs running at
the same time? We start and finish each job before moving to the
next. Therefore, the timescale of disruption is kept to a minimum.
|